DUKE ENERGY CENTER

Initially designed as a headquarters for Wachovia, a mid-project tenant change required careful MEP coordination.

 

Project Location: Charlotte, NC

Project Role: Virtual Coordination

Project Highlights

  •  Six, 2,250kW generators installed in a facility that is located next to residential properties.
  •  Mandatory 65db sound level at the property line.
  •  At the time, this was the largest installation of GE's Entellisys electrical switchgear.
  •  3D scanning and coordination on the podium floors assisted the electrical contractor during installation.